MICA control at the production trailer
The TriCaster 8000, primary stream encoder, monitoring, Companion computer, and Director/TD remain in the Sir Pizza lot. MICA camera feeds return directly to the TriCaster by SDI.
BluesFest 2026Production plan
LPMC production crew / BluesFest 2026
Cover the MICA Stage directly from the production trailer, with three XF605s and the on-stage PTZ routed by SDI to the TriCaster. At the Fish Ladder Stage, switch three local cameras at FoH and return SRT program, NDI multiview, remote control, and production-network traffic across the dedicated wireless bridge.
System layout
Only one outdoor stage is live at a time. Keep both stages connected and ready so consecutive one-hour sets can change without moving the production trailer or control position.
The TriCaster 8000, primary stream encoder, monitoring, Companion computer, and Director/TD remain in the Sir Pizza lot. MICA camera feeds return directly to the TriCaster by SDI.
Three Fish Ladder cameras feed the ATEM Television Studio Pro 4K by SDI. Audio enters the designated camera and remains embedded in the ATEM program path.
The ATEM program returns by SRT. Its multiview is captured by AJA U-TAP and OBS, published as NDI, and independently decoded to SDI at the production trailer.
All four camera paths return by direct SDI to the TriCaster in the production trailer.
All three 1080p29.97 SDI feeds terminate at the ATEM Television Studio Pro 4K at FOH.
Signal architecture
This is the Fish Ladder Stage signal path. The bridge carries compressed program, low-latency multiview, remote ATEM control, and production-network traffic as distinct functions.
ATEM program SDI, with embedded audio, feeds the Blackmagic Streaming Encoder 4K. The paired decoder returns SDI to a dedicated TriCaster input.
ATEM multiview SDI feeds the AJA U-TAP and OBS. The NDI stream is decoded by the Magewell converter and delivered as SDI for trailer monitoring through the TriCaster system.
ATEM Ethernet and Companion remain on the same production LAN across the bridge. Save the ATEM and Companion configuration before show day.
Networked stage placement
Keep the trailer in the lot adjacent to Sir Pizza. Build the Fish Ladder ATEM, SRT encoder, OBS/U-TAP multiview encoder, switch, and bridge AP together at FOH.
Confirm clear line of sight, AP mounting height, power, and practical Ethernet routes before show day. Do not assume the JazzFest bridge geometry is identical.
Three XF605s and the on-stage PTZ feed the TriCaster using the protected local route. Audio is embedded in the wide camera.
Keep the ATEM, both encoders, edge switch, and confidence monitoring in one protected position.
Mount both UniFi APs on C-stands and extend Ethernet only as needed to place each unit securely across the street.
Turner Street wireless bridge
Use two UniFi APs in Bridge mode, each mounted on a C-stand. Keep both ends wired to the production LAN and reserve the RF path for production traffic.
Power distribution
The City of Lansing will feed shore power to the trailer in the Sir Pizza lot. The Honda generator and its trailer-power arrangement are removed from the primary BluesFest plan.
LPMC coverage schedule
Set end times below assume approximately 60 minutes. The official schedule publishes start times only. Fish Ladder stays connected throughout both days.
Start times and performers verified against the official MICA BluesFest schedule as of Monday, September 14. View the official BluesFest schedule for the most up-to-date information. Approximate end times use an expected 60-minute set duration.
Stage changeover procedure
The Director/TD remains at the production trailer. Companion controls Fish Ladder, the NDI return supplies multiview, and decoded SRT program appears as a single TriCaster source.
Cut MICA directly on the TriCaster. Before Fish Ladder, confirm multiview, decoded program, embedded audio, Companion feedback, and a safe wide shot.
Take a full-screen graphic or bumper. Select the Fish Ladder wide on the ATEM, verify decoded audio and video, then take its TriCaster source.
Cut Fish Ladder cameras on the remote ATEM while TriCaster holds the decoded program on air. Complete the staggered operator walk after the change.